Buzzi Maryneal Wind Project (26INR0297)

Buzzi Maryneal Wind Project is a 18.0 MW other interconnection project in Nolan, Texas with a current status of operational. It is proposed to connect at 1413 SWEETCRK-9 .

18.0 MWCapacity
OperationalStatus
NolanMarket
OtherTechnology

Project facts

Canonical nameBuzzi Maryneal Wind Project
Queue ID26INR0297
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketNolan
TechnologyOther
Capacity18.0 MW
StateTexas
CountyNolan
Point of interconnection1413 SWEETCRK-9
Requested (queue) date2023-10-25
Proposed in-service date
Operational date2026-01-02
Withdrawn date
DeveloperBuzzi Unicem USA
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata