Bypass BESS II (26INR0525)

Bypass BESS II is a 205.9 MW other interconnection project in Fort Bend, Texas with a current status of operational. It is proposed to connect at 44000 Wa Parish 345 kV.

205.9 MWCapacity
OperationalStatus
Fort BendMarket
OtherTechnology

Project facts

Canonical nameBypass BESS II
Queue ID26INR0525
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFort Bend
TechnologyOther
Capacity205.9 MW
StateTexas
CountyFort Bend
Point of interconnection44000 Wa Parish 345 kV
Requested (queue) date2024-11-19
Proposed in-service date
Operational date2028-04-30
Withdrawn date
DeveloperBypass BESS II LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata