Byrd Ranch Repower (24INR0712)

Byrd Ranch Repower is a 5.5 MW other interconnection project in Brazoria, Texas with a current status of active. It is proposed to connect at 39700 SWEENY 138kV.

5.5 MWCapacity
ActiveStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameByrd Ranch Repower
Queue ID24INR0712
Statusactive
Source status—
MarketBrazoria
TechnologyOther
Capacity5.5 MW
StateTexas
CountyBrazoria
Point of interconnection39700 SWEENY 138kV
Requested (queue) date—
Proposed in-service date2027-01-22
Operational date—
Withdrawn date—
DeveloperByrd Ranch Storage LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31proposed_online_date2026-03-302027-01-22medium
2026-07-31new_project—activehigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-11

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.