Byrd Ranch Repower (24INR0712)

Byrd Ranch Repower is a 5.5 MW other interconnection project in Brazoria, Texas with a current status of active. It is proposed to connect at 39700 SWEENY 138kV.

5.5 MWCapacity
ActiveStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameByrd Ranch Repower
Queue ID24INR0712
Statusactive
Source status
MarketBrazoria
TechnologyOther
Capacity5.5 MW
StateTexas
CountyBrazoria
Point of interconnection39700 SWEENY 138kV
Requested (queue) date
Proposed in-service date2026-03-30
Operational date
Withdrawn date
DeveloperByrd Ranch Storage LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata