Byron 161kV (J3041)

Byron 161kV is a 200.0 MW solar interconnection project in Olmsted, Minnesota with a current status of operational. It is proposed to connect at Byron 161kV.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameByron 161kV
Queue IDJ3041
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity200.0 MW
StateMinnesota
CountyOlmsted
Point of interconnectionByron 161kV
Requested (queue) date2022-09-13
Proposed in-service date2029-08-31
Operational date2029-08-31
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.