C D McIntosh Jr (676_IC2)

C D McIntosh Jr is a 2.5 MW other interconnection project in Polk, Florida with a current status of operational.

2.5 MWCapacity
OperationalStatus
FMPPMarket
OtherTechnology

Project facts

Canonical nameC D McIntosh Jr
Queue ID676_IC2
Statusoperational
Source status(OP) Operating
MarketFMPP
TechnologyOther
Capacity2.5 MW
StateFlorida
CountyPolk
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1970-01-01
Withdrawn date—
Developer—
Utility / transmission ownerCity of Lakeland - (FL)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata