CA Queue Project 101012000000 — Wind in Mojave, California

CA Queue Project 101012000000 — Wind in Mojave, California is a 150.0 MW wind interconnection project in Mojave, California with a current status of withdrawn. It is proposed to connect at Pine Tree 230kV Substation.

150.0 MWCapacity
WithdrawnStatus
CAMarket
WindTechnology

Project facts

Canonical nameCA Queue Project 101012000000 — Wind in Mojave, California
Queue ID101012000000
Statuswithdrawn
Source statusInterconnection Request withdrawn
MarketCA
TechnologyWind
Capacity150.0 MW
StateCalifornia
CountyMojave
Point of interconnectionPine Tree 230kV Substation
Requested (queue) date2010-10-12
Proposed in-service date2018-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ladwp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata