CA Queue Project 120518000000 — Solar in Baker, California

CA Queue Project 120518000000 — Solar in Baker, California is a 150.0 MW solar interconnection project in Baker, California with a current status of withdrawn. It is proposed to connect at Mead-Victorville 287kV.

150.0 MWCapacity
WithdrawnStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project 120518000000 — Solar in Baker, California
Queue ID120518000000
Statuswithdrawn
Source statusInterconnection Request Withdrawn per IC on 10-17-14
MarketCA
TechnologySolar
Capacity150.0 MW
StateCalifornia
CountyBaker
Point of interconnectionMead-Victorville 287kV
Requested (queue) date2012-05-18
Proposed in-service date2015-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ladwp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.