CA Queue Project 121129000003 — Wind in Baker, California

CA Queue Project 121129000003 — Wind in Baker, California is a 200.0 MW wind interconnection project in Baker, California with a current status of withdrawn. It is proposed to connect at Mead-Victorville 287kV.

200.0 MWCapacity
WithdrawnStatus
CAMarket
WindTechnology

Project facts

Canonical nameCA Queue Project 121129000003 — Wind in Baker, California
Queue ID121129000003
Statuswithdrawn
Source statusInterconnection Request Withdrawn per IC on 10-17-14
MarketCA
TechnologyWind
Capacity200.0 MW
StateCalifornia
CountyBaker
Point of interconnectionMead-Victorville 287kV
Requested (queue) date2012-11-29
Proposed in-service date2016-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ladwp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata