CA Queue Project 181228000000 — Solar in Lancaster, California
CA Queue Project 181228000000 — Solar in Lancaster, California is a 124.0 MW solar interconnection project in Lancaster, California with a current status of withdrawn. It is proposed to connect at Rosamond 230kV Switching Station.
124.0 MWCapacity
WithdrawnStatus
CAMarket
SolarTechnology
Project facts
| Canonical name | CA Queue Project 181228000000 — Solar in Lancaster, California |
|---|---|
| Queue ID | 181228000000 |
| Status | withdrawn |
| Source status | Withdrawn per IC's request on 10/15/19 |
| Market | CA |
| Technology | Solar |
| Capacity | 124.0 MW |
| State | California |
| County | Lancaster |
| Point of interconnection | Rosamond 230kV Switching Station |
| Requested (queue) date | 2018-12-28 |
| Proposed in-service date | 2021-10-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Los Angeles Department of Water and Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: ladwp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata