CA Queue Project 190731000000 — Battery in Los Angeles, California
CA Queue Project 190731000000 — Battery in Los Angeles, California is a 200.0 MW battery interconnection project in Los Angeles, California with a current status of operational. It is proposed to connect at Fairfax 138kV Substation.
200.0 MWCapacity
OperationalStatus
CAMarket
BatteryTechnology
Project facts
| Canonical name | CA Queue Project 190731000000 — Battery in Los Angeles, California |
|---|---|
| Queue ID | 190731000000 |
| Status | operational |
| Source status | SIS completed. FS Agreement in progress |
| Market | CA |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | California |
| County | Los Angeles |
| Point of interconnection | Fairfax 138kV Substation |
| Requested (queue) date | 2019-07-31 |
| Proposed in-service date | — |
| Operational date | 2023-11-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Los Angeles Department of Water and Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: ladwp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.