CA Queue Project 2017-G1 — Solar in Multiple, California

CA Queue Project 2017-G1 — Solar in Multiple, California is a 600.0 MW solar interconnection project in Multiple, California with a current status of withdrawn. It is proposed to connect at Tracy 230 kV Substation.

600.0 MWCapacity
WithdrawnStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project 2017-G1 — Solar in Multiple, California
Queue ID2017-G1
Statuswithdrawn
Source statusWithdrawn
MarketCA
TechnologySolar
Capacity600.0 MW
StateCalifornia
CountyMultiple
Point of interconnectionTracy 230 kV Substation
Requested (queue) date2017-01-30
Proposed in-service date2024-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Sierra Nevada Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: wapa-sn-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata