CA Queue Project 2023-G3 — Solar in San Joaquin, California

CA Queue Project 2023-G3 — Solar in San Joaquin, California is a 100.0 MW solar interconnection project in San Joaquin, California with a current status of withdrawn. It is proposed to connect at New Point 69 kV Substation.

100.0 MWCapacity
WithdrawnStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project 2023-G3 — Solar in San Joaquin, California
Queue ID2023-G3
Statuswithdrawn
Source statusWithdrawn
MarketCA
TechnologySolar
Capacity100.0 MW
StateCalifornia
CountySan Joaquin
Point of interconnectionNew Point 69 kV Substation
Requested (queue) date2023-03-24
Proposed in-service date2026-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Sierra Nevada Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-sn-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata