CA Queue Project 2024-G1 — Solar in Tehama, California

CA Queue Project 2024-G1 — Solar in Tehama, California is a 200.0 MW solar interconnection project in Tehama, California with a current status of withdrawn. It is proposed to connect at Olinda-O'Banion #1 230 kV Transmission Line.

200.0 MWCapacity
WithdrawnStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project 2024-G1 — Solar in Tehama, California
Queue ID2024-G1
Statuswithdrawn
Source statusWithdrawn
MarketCA
TechnologySolar
Capacity200.0 MW
StateCalifornia
CountyTehama
Point of interconnectionOlinda-O'Banion #1 230 kV Transmission Line
Requested (queue) date2024-09-03
Proposed in-service date2028-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Sierra Nevada Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: wapa-sn-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.