CA Queue Project 2026-G1 — Battery in Alameda, California

CA Queue Project 2026-G1 — Battery in Alameda, California is a 500.0 MW battery interconnection project in Alameda, California with a current status of active. It is proposed to connect at Tracy 230 kV Substation.

500.0 MWCapacity
ActiveStatus
CAMarket
BatteryTechnology

Project facts

Canonical nameCA Queue Project 2026-G1 — Battery in Alameda, California
Queue ID2026-G1
Statusactive
Source statusActive
MarketCA
TechnologyBattery
Capacity500.0 MW
StateCalifornia
CountyAlameda
Point of interconnectionTracy 230 kV Substation
Requested (queue) date2026-02-25
Proposed in-service date2031-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Sierra Nevada Region

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: wapa-sn-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata