CA Queue Project 230714000000 — Battery in Los Angeles, California

CA Queue Project 230714000000 — Battery in Los Angeles, California is a 100.0 MW battery interconnection project in Los Angeles, California with a current status of withdrawn. It is proposed to connect at Century-Wilmington 138kV Line.

100.0 MWCapacity
WithdrawnStatus
CAMarket
BatteryTechnology

Project facts

Canonical nameCA Queue Project 230714000000 — Battery in Los Angeles, California
Queue ID230714000000
Statuswithdrawn
Source statusWithdrawn per IC's request on 12/13/24
MarketCA
TechnologyBattery
Capacity100.0 MW
StateCalifornia
CountyLos Angeles
Point of interconnectionCentury-Wilmington 138kV Line
Requested (queue) date2023-07-14
Proposed in-service date2026-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLos Angeles Department of Water and Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: ladwp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata