CA Queue Project Company NR — Solar in Lassen, California

CA Queue Project Company NR — Solar in Lassen, California is a 250.0 MW solar interconnection project in Lassen, California with a current status of suspended. It is proposed to connect at Ft. Sage – Hilltop 345 kV.

250.0 MWCapacity
SuspendedStatus
CAMarket
SolarTechnology

Project facts

Canonical nameCA Queue Project Company NR — Solar in Lassen, California
Queue IDCompany NR
Statussuspended
Source statusExecuted - Suspended
MarketCA
TechnologySolar
Capacity250.0 MW
StateCalifornia
CountyLassen
Point of interconnectionFt. Sage – Hilltop 345 kV
Requested (queue) date2022-09-07
Proposed in-service date2030-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata