CA Queue Project Company QU — Solar+Battery in Washoe/NV, Sierra, California
CA Queue Project Company QU — Solar+Battery in Washoe/NV, Sierra, California is a 150.0 MW solar+battery interconnection project in Washoe/NV, Sierra, California with a current status of withdrawn. It is proposed to connect at Bordertown Substation 120 kV.
150.0 MWCapacity
WithdrawnStatus
CAMarket
Solar+BatteryTechnology
Project facts
| Canonical name | CA Queue Project Company QU — Solar+Battery in Washoe/NV, Sierra, California |
|---|---|
| Queue ID | Company QU |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | CA |
| Technology | Solar+Battery |
| Capacity | 150.0 MW |
| State | California |
| County | Washoe/NV, Sierra |
| Point of interconnection | Bordertown Substation 120 kV |
| Requested (queue) date | 2024-03-26 |
| Proposed in-service date | 2027-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NV Energy (Nevada Power / Sierra Pacific Power) |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata