CA Queue Project Company QU — Solar+Battery in Washoe/NV, Sierra, California

CA Queue Project Company QU — Solar+Battery in Washoe/NV, Sierra, California is a 150.0 MW solar+battery interconnection project in Washoe/NV, Sierra, California with a current status of withdrawn. It is proposed to connect at Bordertown Substation 120 kV.

150.0 MWCapacity
WithdrawnStatus
CAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCA Queue Project Company QU — Solar+Battery in Washoe/NV, Sierra, California
Queue IDCompany QU
Statuswithdrawn
Source statusWithdrawn
MarketCA
TechnologySolar+Battery
Capacity150.0 MW
StateCalifornia
CountyWashoe/NV, Sierra
Point of interconnectionBordertown Substation 120 kV
Requested (queue) date2024-03-26
Proposed in-service date2027-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.