CA Queue Project GI-2023-178 — Battery in Imperial, California

CA Queue Project GI-2023-178 — Battery in Imperial, California is a 75.0 MW battery interconnection project in Imperial, California with a current status of active. It is proposed to connect at 92kV K line.

75.0 MWCapacity
ActiveStatus
CAMarket
BatteryTechnology

Project facts

Canonical nameCA Queue Project GI-2023-178 — Battery in Imperial, California
Queue IDGI-2023-178
Statusactive
Source statusActive
MarketCA
TechnologyBattery
Capacity75.0 MW
StateCalifornia
CountyImperial
Point of interconnection92kV K line
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerImperial Irrigation District

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectactivehigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28

Provenance: iid-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata