CA7 - Big Bend (CS23-04)

CA7 - Big Bend is a 180.0 MW solar+battery interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at AVAHub23-02 230kV.

180.0 MWCapacity
WithdrawnStatus
WAMarket
Solar+BatteryTechnology

Project facts

Canonical nameCA7 - Big Bend
Queue IDCS23-04
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologySolar+Battery
Capacity180.0 MW
StateWashington
CountyAdams
Point of interconnectionAVAHub23-02 230kV
Requested (queue) date2023-04-21
Proposed in-service date
Operational date
Withdrawn date
DeveloperCA7 - Big Bend
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata