CA7 - Big Bend — Interconnection Portfolio

CA7 - Big Bend is associated with 11 tracked interconnection projects representing 2,227 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

11Projects
2Active
0Operational
9Withdrawn
2,227 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar+Battery61,403 MW
Battery2349 MW
Wind2276 MW
Solar1199 MW

Geographic footprint

StateProjects
Washington11

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
CA7 - Big BendCS25-09Solar+Battery375.0 MWactiveAdams, Washington
CA7 - Big BendCS23-05Solar+Battery300.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS23-08Solar199.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS24-08Solar+Battery199.0 MWwithdrawnFranklin, Washington
CA7 - Big BendCS25-14Solar+Battery199.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS23-12Battery199.0 MWactiveFranklin, Washington
CA7 - Big BendCS23-04Solar+Battery180.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS25-16Wind150.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS25-13Solar+Battery150.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS24-03Battery150.0 MWwithdrawnAdams, Washington
CA7 - Big BendCS25-02Wind126.0 MWwithdrawnAdams, Washington

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Monitor CA7 - Big Bend's portfolio across all markets.

Start tracking with interXdata