CA7 - Big Bend (CS23-12)

CA7 - Big Bend is a 199.0 MW battery interconnection project in Franklin, Washington with a current status of active. It is proposed to connect at Saddle Mountain - Walla Walla 230kV.

199.0 MWCapacity
ActiveStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameCA7 - Big Bend
Queue IDCS23-12
Statusactive
Source statusLGIA
MarketWA
TechnologyBattery
Capacity199.0 MW
StateWashington
CountyFranklin
Point of interconnectionSaddle Mountain - Walla Walla 230kV
Requested (queue) date2023-05-01
Proposed in-service date2027-01-10
Operational date
Withdrawn date
DeveloperCA7 - Big Bend
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata