CA7 - Big Bend (CS24-03)

CA7 - Big Bend is a 150.0 MW battery interconnection project in Adams, Washington with a current status of withdrawn. It is proposed to connect at Saddle Mountain 115kV Station.

150.0 MWCapacity
WithdrawnStatus
WAMarket
BatteryTechnology

Project facts

Canonical nameCA7 - Big Bend
Queue IDCS24-03
Statuswithdrawn
Source statusWithdrawn
MarketWA
TechnologyBattery
Capacity150.0 MW
StateWashington
CountyAdams
Point of interconnectionSaddle Mountain 115kV Station
Requested (queue) date2024-04-19
Proposed in-service date2031-06-17
Operational date
Withdrawn date
DeveloperCA7 - Big Bend
Utility / transmission ownerAvista Utilities

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: avista-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.