CAC Green H2 Facility (L0555)

CAC Green H2 Facility is a 1,600.0 MW other interconnection project in Columbia, Washington with a current status of withdrawn. It is proposed to connect at Allston Substation or St Johns Substation.

1,600.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameCAC Green H2 Facility
Queue IDL0555
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity1,600.0 MW
StateWashington
CountyColumbia
Point of interconnectionAllston Substation or St Johns Substation
Requested (queue) date2023-03-28
Proposed in-service date2030-01-02
Operational date
Withdrawn date
DeveloperColumbia River People's Utility District
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata