Cadet Storage (25INR0347)

Cadet Storage is a 104.4 MW other interconnection project in Brazos, Texas with a current status of operational. It is proposed to connect at Tap 69kV 32864 BRYN_ATK69 to 32873 BRYN SHADY.

104.4 MWCapacity
OperationalStatus
BrazosMarket
OtherTechnology

Project facts

Canonical nameCadet Storage
Queue ID25INR0347
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBrazos
TechnologyOther
Capacity104.4 MW
StateTexas
CountyBrazos
Point of interconnectionTap 69kV 32864 BRYN_ATK69 to 32873 BRYN SHADY
Requested (queue) date2023-05-22
Proposed in-service date
Operational date2029-07-28
Withdrawn date
DeveloperTX BESS 5, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata