Cado Storage (25INR0346)

Cado Storage is a 205.5 MW other interconnection project in Bexar, Texas with a current status of operational. It is proposed to connect at Tap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1.

205.5 MWCapacity
OperationalStatus
BexarMarket
OtherTechnology

Project facts

Canonical nameCado Storage
Queue ID25INR0346
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketBexar
TechnologyOther
Capacity205.5 MW
StateTexas
CountyBexar
Point of interconnectionTap 138 kV Line from Braunig East (#5030) to Highland Hills (#5205) Ckt. 1
Requested (queue) date2023-03-13
Proposed in-service date—
Operational date2030-06-08
Withdrawn date—
DeveloperCado Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30phaseSS Completed, FIS Started, No IASS Completed, FIS Completed, No IAlow
2026-09-30operational_date2029-04-062030-06-08medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata