Cairos Storage 2 is a 184.0 MW battery interconnection project in Kinney, Texas with a current status of withdrawn.

184.0 MWCapacity
WithdrawnStatus
KinneyMarket
BatteryTechnology

Project facts

Canonical nameCairos Storage 2
Queue ID26INR0448
Statuswithdrawn
Source status—
MarketKinney
TechnologyBattery
Capacity184.0 MW
StateTexas
CountyKinney
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-08-24
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30developer Cairos Solar, LLC—low
2026-09-30poi_name7425 ODLAW SWITCH 138kV—low
2026-09-30phaseSS Completed, FIS Started, No IA—low
2026-09-30operational_date2028-12-31—medium
2026-09-30withdrawn_date—2026-08-24high
2026-09-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata