Cairos Storage (26INR0245)

Cairos Storage is a 77.3 MW battery interconnection project in Kinney, Texas with a current status of withdrawn.

77.3 MWCapacity
WithdrawnStatus
KinneyMarket
BatteryTechnology

Project facts

Canonical nameCairos Storage
Queue ID26INR0245
Statuswithdrawn
Source status—
MarketKinney
TechnologyBattery
Capacity77.3 MW
StateTexas
CountyKinney
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-08-24
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-30developerCairos Solar, LLC—low
2026-09-30poi_name7425 ODLAW SWITCH 138kV—low
2026-09-30phaseSS Completed, FIS Started, No IA—low
2026-09-30operational_date2028-12-31—medium
2026-09-30withdrawn_date—2026-08-24high
2026-09-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata