Caldwell County - Barkley 161kV (J1632)

Caldwell County - Barkley 161kV is a 200.0 MW solar interconnection project in Caldwell, Kentucky with a current status of withdrawn. It is proposed to connect at Caldwell County - Barkley 161kV.

200.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCaldwell County - Barkley 161kV
Queue IDJ1632
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity200.0 MW
StateKentucky
CountyCaldwell
Point of interconnectionCaldwell County - Barkley 161kV
Requested (queue) date2020-06-22
Proposed in-service date2023-09-01
Operational date2023-09-01
Withdrawn date2023-07-17
Developer
Utility / transmission ownerBIG RIVERS ELECTRIC CORPORATION

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.