Caliche Mound Solar (23INR0056)

Caliche Mound Solar is a 406.6 MW solar interconnection project in Deaf Smith, Texas with a current status of operational. It is proposed to connect at Mule Deer Switch 23921 (tap 345kV 23906 AJSwope - 23910 Windmill).

406.6 MWCapacity
OperationalStatus
Deaf SmithMarket
SolarTechnology

Project facts

Canonical nameCaliche Mound Solar
Queue ID23INR0056
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketDeaf Smith
TechnologySolar
Capacity406.6 MW
StateTexas
CountyDeaf Smith
Point of interconnectionMule Deer Switch 23921 (tap 345kV 23906 AJSwope - 23910 Windmill)
Requested (queue) date2020-07-24
Proposed in-service date—
Operational date2027-10-26
Withdrawn date—
DeveloperCIG DS1 LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-30developerTierra Blanco Solar LLCCIG DS1 LLClow
2026-10-30poi_nametap 345kV 23906 AJSwope - 23910 WindmillMule Deer Switch 23921 (tap 345kV 23906 AJSwope - 23910 Windmill)low
2026-10-30phaseSS Completed, FIS Started, IASS Completed, FIS Completed, IAlow
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata