CALIFORNIA VALLEY SOLAR RANCH (FKA CARRIZO SOLAR FARM II) (239)

CALIFORNIA VALLEY SOLAR RANCH (FKA CARRIZO SOLAR FARM II) is a 250.0 MW solar interconnection project in San Luis Obispo, California with a current status of operational. It is proposed to connect at Midway-Morro Bay 230kV line.

250.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCALIFORNIA VALLEY SOLAR RANCH (FKA CARRIZO SOLAR FARM II)
Queue ID239
Statusoperational
Source statusCOMPLETED
Market
TechnologySolar
Capacity250.0 MW
StateCalifornia
CountySan Luis Obispo
Point of interconnectionMidway-Morro Bay 230kV line
Requested (queue) date2007-07-11
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata