Callisto I Energy Center (66338_CALL1)

Callisto I Energy Center is a 223.4 MW battery interconnection project in Harris, Texas with a current status of operational.

223.4 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology

Project facts

Canonical nameCallisto I Energy Center
Queue ID66338_CALL1
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologyBattery
Capacity223.4 MW
StateTexas
CountyHarris
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-08-01
Withdrawn date—
Developer—
Utility / transmission ownerCallisto II Energy Center LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.