CALRENEW-1 EXPANSION (682)

CALRENEW-1 EXPANSION is a 1.2 MW solar interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Mendota Biomass Tap line 70 KV.

1.2 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCALRENEW-1 EXPANSION
Queue ID682
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity1.2 MW
StateCalifornia
CountyFresno
Point of interconnectionMendota Biomass Tap line 70 KV
Requested (queue) date2011-03-31
Proposed in-service date
Operational date
Withdrawn date2012-04-02
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.