Camden-Crystal II 69kV (AC2-068)

Camden-Crystal II 69kV is a 20.0 MW solar interconnection project in Preble, Ohio with a current status of active.

20.0 MWCapacity
ActiveStatus
Market
SolarTechnology

Project facts

Canonical nameCamden-Crystal II 69kV
Queue IDAC2-068
Statusactive
Source statusUnder Construction
Market
TechnologySolar
Capacity20.0 MW
StateOhio
CountyPreble
Point of interconnection
Requested (queue) date2017-02-27
Proposed in-service date2027-01-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerDayton

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata