Camino Santiago Solar (22INR0605)

Camino Santiago Solar is a 196.3 MW solar interconnection project in Milam, Texas with a current status of operational. It is proposed to connect at 345 kV Herndon Switch Substation (#3804).

196.3 MWCapacity
OperationalStatus
MilamMarket
SolarTechnology

Project facts

Canonical nameCamino Santiago Solar
Queue ID22INR0605
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketMilam
TechnologySolar
Capacity196.3 MW
StateTexas
CountyMilam
Point of interconnection345 kV Herndon Switch Substation (#3804)
Requested (queue) date2022-09-02
Proposed in-service date
Operational date2027-09-01
Withdrawn date
DeveloperCamino Ranch Solar Project LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata