Canadian River-Muskogee and Muskogee-Seminole 345kV (GEN-2026-SR4)

Canadian River-Muskogee and Muskogee-Seminole 345kV is a 400.0 MW battery interconnection project in Oktaha, Oklahoma with a current status of active. It is proposed to connect at Canadian River-Muskogee and Muskogee-Seminole 345kV.

400.0 MWCapacity
ActiveStatus
OKMarket
BatteryTechnology

Project facts

Canonical nameCanadian River-Muskogee and Muskogee-Seminole 345kV
Queue IDGEN-2026-SR4
Statusactive
Source statusSPECIAL STUDY
MarketOK
TechnologyBattery
Capacity400.0 MW
StateOklahoma
CountyOktaha
Point of interconnectionCanadian River-Muskogee and Muskogee-Seminole 345kV
Requested (queue) date2025-11-17
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerOG&E

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata