OG&E — Interconnection Queue Projects

OG&E is associated with 35 tracked interconnection projects representing 5,706 MW of requested capacity.

Entity resolution: single source organization name; no cluster merge applied.

35Projects
30Active
1Operational
4Withdrawn
5,706 MWRequested capacity
0Markets

Capacity by technology

TechnologyProjectsRequested capacity
Battery203,038 MW
Other71,580 MW
Wind6794 MW
Solar1200 MW
Gas194 MW

Geographic footprint

StateProjects
Oklahoma33
Texas1
Arkansas1

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Horseshoe Lake 138kVGEN-2024-GR1Other492.0 MWactiveHarrah, Oklahoma
Muskogee 345 KV SubstationGEN-2025-SR9Other400.0 MWactiveFort Gibson, Oklahoma
Canadian River-Muskogee and Muskogee-Seminole 345kVGEN-2026-SR4Battery400.0 MWactiveOktaha, Oklahoma
Open Sky 345kV SubstationGEN-2024-GR6Wind300.0 MWactiveNewkirk, Oklahoma
OG&E Renfrow 345kV SubstationGEN-2025-GR1Wind300.0 MWactiveMedford, Oklahoma
Beaver County 345 kV SubstationGEN-2025-SR28Battery263.1 MWactiveBalko, Oklahoma
Seminole 345 KV SubstationGEN-2025-SR10Other238.0 MWactiveKonawa, Oklahoma
White Tail 345kV SubstationGEN-2025-SR8Battery220.0 MWactiveMorrison, Oklahoma
Tatonga 345 kV SubstationGEN-2025-SR30Battery209.0 MWactiveOakwood, Oklahoma
Minco 345kV SubstationGEN-2025-SR6Battery200.0 MWactiveMinco, Oklahoma
Beaver County Substation 345 kVGEN-2024-SR7Solar200.0 MWactiveBeaver County, Oklahoma
Beaver County 345 kV SubstationGEN-2023-SR11Battery200.0 MWwithdrawnBalko, Oklahoma
Interconnecting at Hugo - Sunnyside 345 kV transmission lineGEN-2024-SR6Battery200.0 MWactiveJohnston County, Oklahoma
Mustang 138 KV SubstationGEN-2025-SR14Battery183.0 MWactiveOklahoma City, Oklahoma
138 kV Greenwood StationGEN-2024-SR5Battery176.9 MWactiveDrumright, Oklahoma
Tatonga 345 kV SubstationGEN-2023-SR10Battery160.0 MWwithdrawnOakwood, Oklahoma
Beaver County Substation 345 kVGEN-2024-SR9Battery150.0 MWactiveBeaver County, Oklahoma
Seminole 138 kV SubstationGEN-2025-SR13Other125.0 MWactiveKonawa, Oklahoma
McClain SubstationGEN-2025-SR15Other125.0 MWactiveNewcastle, Oklahoma
Sooner 138 kV SubstationGEN-2025-SR12Battery116.0 MWactiveRed Rock, Oklahoma
Sooner 345 kV SubstationGEN-2025-SR11Battery112.0 MWactiveRed Rock, Oklahoma
Mustang 138kV SubstationGEN-2025-SR23Other100.0 MWactiveOklahoma City, Oklahoma
Horseshoe Lake 138kV SubstationGEN-2025-SR22Other100.0 MWactiveHarrah, Oklahoma
Tinker Air Force Base 138kVGEN-2023-GR2Gas94.2 MWactiveOklahoma City, Oklahoma
138 kV TRYON 3 (Bus # 515675GEN-2024-SR3Battery72.5 MWactiveLincoln County, Oklahoma
161 kV BRANCH 5 (Bus # 515316)GEN-2024-SR2Battery72.5 MWactiveFranklin County, Arkansas
Breckinridge 138 kV SubstationGEN-2023-SR13Battery70.0 MWoperationalGarfield County, Oklahoma
Tap Mooreland to Woodward 138 kV Line (FPLSwitch 138 kV Substation)GEN-2023-SR16Battery70.0 MWactiveWoodward And Harper Counties, Oklahoma
Woodring 345kV SubstationGEN-2026-PR5Battery60.4 MWactiveGoultry, Oklahoma
Beaver County 345 kV SubstationGEN-2026-PR1Wind52.6 MWactiveGarfield County, Texas
Brown 138kV SubstationGEN-2024-SR13Battery52.2 MWwithdrawnBryan County, Oklahoma
Tap Medford Tap – Coyote 138kVGEN-2024-SR17Battery50.0 MWactiveKay, Oklahoma
Woodring 345kV SubstationGEN-2026-PR6Wind49.7 MWactiveGoltry, Oklahoma
Otter 138kVGEN-2026-PR3Wind49.7 MWwithdrawnGarfield County, Oklahoma
Tatonga 345 kV SubstationGEN-2026-PR2Wind41.9 MWactiveDewey County, Oklahoma

Recent material changes

No material field-level changes have been recorded against these projects since the baseline snapshot. interXdata records changes as new source snapshots are ingested and diffed.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through OG&E.