Caneland 230 kV is a 120.0 MW solar interconnection project in St. Mary, Louisiana with a current status of withdrawn. It is proposed to connect at Caneland 230 kV.

120.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameCaneland 230 kV
Queue IDJ1788
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity120.0 MW
StateLouisiana
CountySt. Mary
Point of interconnectionCaneland 230 kV
Requested (queue) date2020-06-25
Proposed in-service date2023-02-28
Operational date2023-02-28
Withdrawn date2020-09-24
Developer—
Utility / transmission ownerCLECO POWER LLC CLEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.