CLECO POWER LLC CLEC — Interconnection Queue Projects

CLECO POWER LLC CLEC is associated with 130 tracked interconnection projects representing 26,967 MW of requested capacity.

Entity resolution: this utility / transmission entity rolls up 3 source organization name(s) that were auto-matched into a single canonical cluster. Attribution is inferred from source records and may include related special-purpose entities.

130Projects
1Active
48Operational
81Withdrawn
26,967 MWRequested capacity
1Markets

Capacity by technology

TechnologyProjectsRequested capacity
Solar7413,467 MW
Other145,073 MW
Gas164,731 MW
Battery243,342 MW
Wind2356 MW

Portfolio by market

MarketProjects
MISO17

Geographic footprint

StateProjects
Louisiana120

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
MISO Queue Project J4220 — Generation in an unlisted county, the U.S.J4220—1,500.0 MWwithdrawn—
Penton 230KV SubstationJ2911Solar810.0 MWwithdrawnBeauregard, Louisiana
MISO Queue Project E0048 — Gas in Rapides Parish, LouisianaE0048Gas775.0 MWactiveRapides Parish, Louisiana
MISO Queue Project J4299 — Generation in an unlisted county, the U.S.J4299—770.0 MWoperational—
Dolet Hills SubstationJ4133Gas756.0 MWwithdrawnDe Soto, Louisiana
Brame Energy Center6190_3Other703.8 MWoperationalRapides, Louisiana
Brame Energy Center6190_2Other558.0 MWoperationalRapides, Louisiana
HARTBURG - AEP LAYFIELD 500.0kVJ3408Solar450.0 MWwithdrawnSabine, Louisiana
Brame Energy Center6190_1Gas445.5 MWoperationalRapides, Louisiana
Cooper-Penton Road 230kVJ2882Solar410.0 MWwithdrawnBeauregard, Louisiana
MISO Queue Project J4236 — Generation in an unlisted county, the U.S.J4236—400.0 MWoperational—
Rork - Sellers Road 230.0kVJ4110Gas400.0 MWoperationalLafayette, Louisiana
East Leesville-Rodemacher 230 KVJ2916Solar400.0 MWwithdrawnRapides, Louisiana
COLE to PENTON 230.0 kVJ3939Solar386.0 MWwithdrawnBeauregard, Louisiana
HinestonJ3209Solar350.0 MWoperationalRapides, Louisiana
Rork - Sellers Road 230.0kVJ4098Battery300.0 MWoperationalLafayette, Louisiana
MISO Queue Project J4302 — Generation in an unlisted county, the U.S.J4302—300.0 MWoperational—
MISO Queue Project J4320 — Generation in an unlisted county, the U.S.J4320—300.0 MWoperational—
Ville Platte - West Fork 230.0kVJ4075Battery300.0 MWwithdrawnSt. Landry, Louisiana
WellsJ3840Battery300.0 MWoperationalSt. Landry, Louisiana
Cooper - Leesville 138.0kVJ3014Solar280.0 MWwithdrawnRapides, Louisiana
Cooper to Penton Road 230kVJ2884Solar276.0 MWwithdrawnBeauregard, Louisiana
HARTBURG - AEP LAYFIELD 500.0kVJ1890Solar270.0 MWoperationalSabine, Louisiana
Acadia Energy Center55173_ST13Gas264.4 MWoperationalAcadia, Louisiana
Acadia Energy Center55173_ST26Gas264.4 MWoperationalAcadia, Louisiana
CLECO Cooper-Penton Road 230kV LineJ2020Solar260.0 MWwithdrawnBeauregard, Louisiana
ColeJ4201Solar250.0 MWwithdrawnBeauregard, Louisiana
EAST LEESVILLE -RODEMACHER 230J3197Solar250.0 MWwithdrawnRapides, Louisiana
FisherJ2180Solar250.0 MWoperationalSabine, Louisiana
Cole - Penton Road 230.0kVJ3295Solar250.0 MWwithdrawnBeauregard, Louisiana
Bon Wier to Cooper 138 kVJ2505Solar250.0 MWwithdrawnBeauregard, Louisiana
Rodemacher - Sherwood 230.0kVJ3746Solar250.0 MWwithdrawnGrant, Louisiana
West Bay - Centennial 138 kVJ2441Solar250.0 MWwithdrawnBeauregard, Louisiana
Coughlin Power Station1396_7Gas243.1 MWoperationalEvangeline, Louisiana
Acadia Energy Center55173_CT11Gas215.1 MWoperationalAcadia, Louisiana
Acadia Energy Center55173_CT12Gas215.1 MWoperationalAcadia, Louisiana
Acadia Energy Center55173_CT25Gas215.1 MWoperationalAcadia, Louisiana
Acadia Energy Center55173_CT24Gas215.1 MWoperationalAcadia, Louisiana
Cooper - Leesville 138 kVJ2535Battery210.0 MWwithdrawnVermilion, Louisiana
Cooper - Penton 230 kV LineJ1380Solar200.0 MWwithdrawnBeauregard Parish, Louisiana
Cooper - Penton Road 230kV LineJ1282Solar200.0 MWwithdrawnBeauregard Parish, Louisiana
Cooper - Penton Road 230kV LineJ1424Solar200.0 MWoperationalBeauregard Parish, Louisiana
Fisher - Marthaville 230.0kVJ1673Solar200.0 MWoperationalSabine, Louisiana
Patoutville Substation (138kV bus)J1560Solar200.0 MWwithdrawnIberia, Louisiana
Ville Platte - West Fork 230 kV Line TapJ1217Solar200.0 MWwithdrawnSt. Landry Parish, Louisiana
Ville Platte - West Fork 230kVJ2135Solar200.0 MWwithdrawnEvangeline, Louisiana
Layfield - Western Kraft 230.0kVJ2526Solar200.0 MWwithdrawnRed River, Louisiana
Fisher - Many 138.0kVJ3612Solar200.0 MWwithdrawnSabine, Louisiana
MISO Queue Project J4312 — Generation in an unlisted county, the U.S.J4312—200.0 MWoperational—
CaneyJ2083Solar200.0 MWwithdrawnAllen, Louisiana
Cole - Penton Road 230.0kVS1123Battery200.0 MWoperationalBeauregard, Louisiana
Cocodrie - Hineston 230kV lineJ2529Solar200.0 MWwithdrawnRapides, Louisiana
Carroll - Mansfield 138 kV Line TapJ1452Solar200.0 MWwithdrawnRed River Parish, Louisiana
Roy S Nelson - DeRidder Mill 138 kVJ2860Solar200.0 MWwithdrawnBeauregard, Louisiana
Eola - Marksville 138.0kVJ3581Battery200.0 MWwithdrawnAvoyelles, Louisiana
Fisher - Many 138.0kVJ3771Battery200.0 MWwithdrawnSabine, Louisiana
Ville Platte - West Fork 230 kV LineJ1384Solar200.0 MWwithdrawnEvangeline Parish, Louisiana
Cooper to Penton Road 230 kVJ2942Solar200.0 MWwithdrawnBeauregard, Louisiana
Eola-Marksville 138 kVJ3170Solar200.0 MWoperationalAvoyelles, Louisiana
Rapides - Rodemacher 230 kV Line TapJ1220Solar200.0 MWwithdrawnRapides Parish, Louisiana
Deridder - Longville 138.0kVJ4092Solar200.0 MWoperationalBeauregard, Louisiana
HinestonJ3479Solar200.0 MWoperationalRapides, Louisiana
Ville Platte - West Fork 230.0kVJ3368Wind199.9 MWoperationalSt. Landry, Louisiana
Coughlin Power Station1396_U72Gas188.7 MWoperationalEvangeline, Louisiana
Coughlin Power Station1396_U6CTGas188.7 MWoperationalEvangeline, Louisiana
Coughlin Power Station1396_U7CTGas188.7 MWoperationalEvangeline, Louisiana
MISO Queue Project J4308 — Generation in an unlisted county, the U.S.J4308—185.0 MWoperational—
Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904J2737Solar180.0 MWoperationalSabine, Louisiana
Deridder Mill - Roy S Nelson 138 kVJ3026Battery175.0 MWwithdrawnBeauregard, Louisiana
Bon Wier to Cooper 138 kVJ2500Battery175.0 MWwithdrawnBeauregard, Louisiana
West Bay - Centennial 138 kVJ2543Battery175.0 MWwithdrawnBeauregard, Louisiana
EuniceJ2714Solar162.0 MWwithdrawnSt. Landry, Louisiana
Ville Platte - West Fork 230.0kVJ3394Wind155.6 MWoperationalSt. Landry, Louisiana
Cocodrie - Ville Platte 230.0kVJ3238Solar155.0 MWwithdrawnEvangeline, Louisiana
Longville - Nelson (EES) 138.0kVJ3582Solar150.0 MWwithdrawnBeauregard, Louisiana
Manuel 138 kV SubstationJ1286Solar150.0 MWoperationalEvangeline Parish, Louisiana
Teche - Morbihan 138kV LineJ1455Solar150.0 MWwithdrawnSt. Mary,St. Mary Parish, Louisiana
Pine Prairie to Coughlin 138 kVJ1796Solar150.0 MWwithdrawnEvangeline, Louisiana
NELSON 230 SWYD - PENTON ROAD (CLECO) 230.0kVJ4079Battery150.0 MWoperationalCalcasieu, Louisiana
Plaisance 138kVJ1832Solar145.1 MWoperationalSt. Landry, Louisiana

Recent material changes

ObservedProjectFieldOldNew
2026-11-25Coughlin - Pine Prairie 138.0kVcapacity_mw200.00
2026-11-21Coughlin - Plaisance 138 kVcapacity_mw100.00
2026-11-18Dolet Hills 345 kV (Bus #500260)capacity_mw330.00
2026-11-05Cooper - Leesville 138.0kVwithdrawn_date—2026-10-20
2026-11-05Cooper - Leesville 138.0kVstatusoperationalwithdrawn
2026-11-05Eunicewithdrawn_date—2026-10-20
2026-11-05Eunicestatusoperationalwithdrawn
2026-11-051673 Interconnection Substationwithdrawn_date—2026-10-20
2026-11-051673 Interconnection Substationstatusoperationalwithdrawn
2026-11-05Layfield - Western Kraft 230.0kVwithdrawn_date—2026-10-20
2026-11-05Layfield - Western Kraft 230.0kVstatusoperationalwithdrawn
2026-10-31Sharing substation for J1890. POI for J1890 is not in the MTEP22 model yet. Reference bus A: 48904phasePhase 2Phase 3

Explore related data

Source last checked2026-07-31
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Track queue activity connecting through CLECO POWER LLC CLEC.

Start tracking with interXdata