Caneland 230kV Substation (J1367)

Caneland 230kV Substation is a 95.0 MW solar interconnection project in St. Mary,St. Mary Parish, Louisiana with a current status of operational. It is proposed to connect at Caneland 230kV Substation.

95.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameCaneland 230kV Substation
Queue IDJ1367
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity95.0 MW
StateLouisiana
CountySt. Mary,St. Mary Parish
Point of interconnectionCaneland 230kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2021-07-01
Operational date2021-07-01
Withdrawn date
Developer
Utility / transmission ownerCleco Power LLC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.