Cannon Falls 115kV Substation (J1054)

Cannon Falls 115kV Substation is a 30.0 MW battery interconnection project in Goodhue County, Minnesota with a current status of withdrawn. It is proposed to connect at Cannon Falls 115kV Substation.

30.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCannon Falls 115kV Substation
Queue IDJ1054
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity30.0 MW
StateMinnesota
CountyGoodhue County
Point of interconnectionCannon Falls 115kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2021-10-31
Operational date2021-10-31
Withdrawn date2020-03-25
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata