Capricorn I & III repower (17INR0054)

Capricorn I & III repower is a 32.0 MW other interconnection project in Sterling, Texas with a current status of operational. It is proposed to connect at 180757 Capricorn Ridge 3 138kV.

32.0 MWCapacity
OperationalStatus
SterlingMarket
OtherTechnology

Project facts

Canonical nameCapricorn I & III repower
Queue ID17INR0054
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketSterling
TechnologyOther
Capacity32.0 MW
StateTexas
CountySterling
Point of interconnection180757 Capricorn Ridge 3 138kV
Requested (queue) date2017-03-09
Proposed in-service date
Operational date2026-06-30
Withdrawn date
DeveloperNextera
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata