CAPTIVA ENERGY STORAGE (1806)

CAPTIVA ENERGY STORAGE is a 250.0 MW battery interconnection project in Orange, California with a current status of withdrawn. It is proposed to connect at Trabuco - Capistrano 138 kV Line.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameCAPTIVA ENERGY STORAGE
Queue ID1806
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyBattery
Capacity250.0 MW
StateCalifornia
CountyOrange
Point of interconnectionTrabuco - Capistrano 138 kV Line
Requested (queue) date2020-04-15
Proposed in-service date
Operational date
Withdrawn date2026-07-29
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31withdrawn_date2026-07-29high
2026-07-31statusactivewithdrawnhigh
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.