Carborundum Substation Upgrade (L0460)

Carborundum Substation Upgrade is a 120.0 MW other interconnection project in Clark, Washington with a current status of withdrawn. It is proposed to connect at Ross-Carborundum No. 1 115 kV.

120.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology

Project facts

Canonical nameCarborundum Substation Upgrade
Queue IDL0460
Statuswithdrawn
Source statusWITHDRAWN
MarketWA
TechnologyOther
Capacity120.0 MW
StateWashington
CountyClark
Point of interconnectionRoss-Carborundum No. 1 115 kV
Requested (queue) date2019-04-29
Proposed in-service date2023-01-01
Operational date
Withdrawn date
DeveloperClark Public Utilities
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.