CARLSBAD 1 (137)
CARLSBAD 1 is a 211.0 MW gas interconnection project in San Diego, California with a current status of operational. It is proposed to connect at Encina Substation 230 kV.
211.0 MWCapacity
OperationalStatus
—Market
GasTechnology
Project facts
| Canonical name | CARLSBAD 1 |
|---|---|
| Queue ID | 137 |
| Status | operational |
| Source status | COMPLETED |
| Market | — |
| Technology | Gas |
| Capacity | 211.0 MW |
| State | California |
| County | San Diego |
| Point of interconnection | Encina Substation 230 kV |
| Requested (queue) date | 2006-10-17 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SDGE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata