Carlstadt 13.2 kV (AE2-100)

Carlstadt 13.2 kV is a 2.3 MW solar interconnection project in Bergen, New Jersey with a current status of withdrawn.

2.3 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameCarlstadt 13.2 kV
Queue IDAE2-100
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity2.3 MW
StateNew Jersey
CountyBergen
Point of interconnection—
Requested (queue) date2019-02-28
Proposed in-service date2020-03-02
Operational date—
Withdrawn date2019-08-14
Developer—
Utility / transmission ownerPSEG Long Island

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata