Carolina Storage Friendswood (25INR0550)

Carolina Storage Friendswood is a 105.1 MW other interconnection project in Brazoria, Texas with a current status of operational. It is proposed to connect at TAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD.

105.1 MWCapacity
OperationalStatus
BrazoriaMarket
OtherTechnology

Project facts

Canonical nameCarolina Storage Friendswood
Queue ID25INR0550
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketBrazoria
TechnologyOther
Capacity105.1 MW
StateTexas
CountyBrazoria
Point of interconnectionTAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD
Requested (queue) date2024-02-02
Proposed in-service date
Operational date2027-09-30
Withdrawn date
DeveloperCSE Storage, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata