Carolina Storage Wichita Falls (25INR0628)
Carolina Storage Wichita Falls is a 202.0 MW other interconnection project in Archer, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1422 Bowman - 1458 Cobb Switch.
202.0 MWCapacity
OperationalStatus
ArcherMarket
OtherTechnology
Project facts
| Canonical name | Carolina Storage Wichita Falls |
|---|---|
| Queue ID | 25INR0628 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Archer |
| Technology | Other |
| Capacity | 202.0 MW |
| State | Texas |
| County | Archer |
| Point of interconnection | Tap 345kV 1422 Bowman - 1458 Cobb Switch |
| Requested (queue) date | 2024-02-26 |
| Proposed in-service date | — |
| Operational date | 2028-08-01 |
| Withdrawn date | — |
| Developer | CSE Storage, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.