Cartwheel BESS 2 (23INR0495)

Cartwheel BESS 2 is a 156.9 MW other interconnection project in Hopkins, Texas with a current status of operational. It is proposed to connect at Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch.

156.9 MWCapacity
OperationalStatus
HopkinsMarket
OtherTechnology

Project facts

Canonical nameCartwheel BESS 2
Queue ID23INR0495
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketHopkins
TechnologyOther
Capacity156.9 MW
StateTexas
CountyHopkins
Point of interconnectionTap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch
Requested (queue) date2022-06-02
Proposed in-service date
Operational date2028-06-15
Withdrawn date
DeveloperRWE Solar Development, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.