Carty CCCT (G0457)

Carty CCCT is a 36.0 MW gas interconnection project in Morrow, Oregon with a current status of operational. It is proposed to connect at Slatt substation..

36.0 MWCapacity
OperationalStatus
ORMarket
GasTechnology

Project facts

Canonical nameCarty CCCT
Queue IDG0457
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyGas
Capacity36.0 MW
StateOregon
CountyMorrow
Point of interconnectionSlatt substation.
Requested (queue) date2011-07-28
Proposed in-service date
Operational date2015-05-01
Withdrawn date
DeveloperPortland General Electric
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.