Casey - Sullivan 345 kV (J1771)

Casey - Sullivan 345 kV is a 197.3 MW solar interconnection project in Cumberland, Illinois with a current status of withdrawn. It is proposed to connect at Casey - Sullivan 345 kV.

197.3 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameCasey - Sullivan 345 kV
Queue IDJ1771
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity197.3 MW
StateIllinois
CountyCumberland
Point of interconnectionCasey - Sullivan 345 kV
Requested (queue) date2020-06-25
Proposed in-service date2023-08-01
Operational date2023-08-01
Withdrawn date2021-03-15
Developer
Utility / transmission ownerAMEREN ILLINOIS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata